| Conway Western Loop Study | ||||||||||||
| Last update: 8-12-2004
On 8-10-2004, the Conway City Council picked Route A as the desired route fro the western loop. Four routes have been proposed:
The blue dots shown on the route maps represent areas of significance to be avoided by the loop right-of-way The location and design will be selected to be acceptable to the City with concurrence of the Arkansas State Highway and Transportation Department (AHTD), the Federal Highway Admininstration (FHWA), and Metroplan. The studies will document the National Enviromental Policy (NEPA) process. A functional preliminary design will be prepared for the selected alignment. Comments may be addressed to: Garver Engineers, Inc. |
||||||||||||